You don't have javascript enabled. Good luck with that.
Pencarian
Dinas SDA Lakukan Pembangunan Waduk Marunda Tahap III

Rp 55 B Prepared for Construction of Marunda Reservoir Phase III

The Jakarta Water Resources Agency (SDA) is about to execute further construction of the Marunda Reservoir (Phase III) on the coast of Jakarta.

We plan to build a 39-hectare-wide reservoir to overcome flooding in this area

Its construction aims to overcome flooding in the Marunda Polder area with a catchment area as wide as 2,882 hectares.

SDA Agency's Data and Information Center (Pusdatin) Head, Nugraharyadi said the scope of work for the construction of the Marunda Reservoir Phase III included construction work on a reservoir embankment of approximately 765 meters and landscaping of Zones 2A and 2B covering a 3.9-hectare-wide land.

City Prepares Centralized Domestic Wastewater Management System

"We plan to build a 39-hectare-wide reservoir to overcome flooding in this area, including area arrangement for public and green open spaces covering an area of 26 hectares," he expressed, Wednesday (1/17).

He added the Marunda Reservoir construction would then await land acquisition, which was currently in the process of extending the location determination.

"To realize it, we'll spend a budget amounting to Rp 55 billion," he stated.

Linked News
Popular News indeks
  1. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye755 personBudhi Firmansyah Surapati
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye737 personAldi Geri Lumban Tobing
  3. Pramono Pushes for Partnership Between New Toto Tentrem and Tarakan Hospitals

    access_time24-08-2026 remove_red_eye667 personDessy Suciati
  4. Transjakarta Commits to Transport Equality Across the Seribu Islands

    access_time24-08-2026 remove_red_eye581 personAldi Geri Lumban Tobing
  5. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye557 personAldi Geri Lumban Tobing